Subfloor Preparation

As with most projects the key to a perfect finish floor is the preparation. The floor should be free from any contamination that may affect adhesion between new floor covering and original subfloor, the correct surface conditions need to be dry, smooth and secure.

 

Below is a list of services offered by Commercial Flooring Services regarding floor preparation prior to installation.

 

  • Removal of existing floor coverings
  • Moisture testing and the application of Damp Proof Membrane - DPM.
  • The supply & installation of an Ardit leveling compound – Depth from 1mm to 45mm.
  • The supply & installation of sheet Masonite or sheet Ply board to timber subfloors.

SERVICES & PRODUCTS

MENU

Submitting Form...

The server encountered an error.

Form received.

PRIVACY POLICY

BUILT BY